In the sunshine North Road of Shuangyang Street, Luojiang District, the staff is conducting a "carpet" inspection of the manhole sewer on the section, dredging the rainwater Wells and drainage channels in low-lying areas, and dredging more than 350 inspection Wells as of the morning of 26, to ensure the safety of the past masses.
"We will pay close attention to the weather, rain, water, flood situation changes, strictly implement 24-hour duty, strengthen the flood season personnel inspection, and according to the traffic flow of each section of Shuangyang, traffic demand and other aspects, take manual operations, focusing on the main road, bus stations and other areas of rainwater Wells to clean up, effectively ensure smooth drainage." Site director Chen Liangzhi said.
It is understood that in order to do a good job of typhoon defense, the district urban Management Bureau set up 10 emergency teams with a total of about 200 people, such as sanitation, greening, road municipal facilities disposal, and equipped with adequate emergency vehicles, clearing vehicles, loading vehicles, pumps, chainsaws, generators and other types of flood prevention emergency rescue facilities, and make full use of the flood prevention "first hand", and play a good flood prevention "preparation battle".
In addition, in order to ensure the safety of the whole district flood season and reduce the risk of urban waterlogging, the district urban Management Bureau also organized personnel to investigate 182 waterlogging waterlogging points in the central city, and informed the streets to do rainwater dredging and dredging around the waterlogging points in advance. At the same time, the street lamp management unit is required to strengthen inspections, timely disposal of hidden lamp poles, in order to prevent collapse and electric shock accidents, combing the list of personnel and equipment, and preparing for emergency rescue and dispatch; Inspect facilities and equipment such as garbage transfer stations and sanitation tool houses, clear large garbage in advance, adjust the frequency of garbage removal, and ensure that garbage transfer work can be carried out normally when typhoons come; Do a good job in the investigation of tree safety hazards, find diseased trees, tilting trees, and other timely treatment to ensure that there is no injury accidents; Organize personnel to investigate outdoor billboards and outdoor high-altitude hanging objects in urban areas one by one, do a good job of rectification and protection and reinforcement, and need to be removed and forcibly removed according to law.
How to solve the problem of urban waterlogging? The use of effective drainage network system can reduce the loss caused by urban waterlogging. Drainage network data monitoring is the lowest and most important part of the pipe network system, providing effective and stable real-time data for the management application platform. Common pipe network monitoring equipment includes manhole level monitor, buried waterlogging water monitor, electronic water gauge, etc., so as to achieve effective collection of monitoring data.